Customers

Built in a real workshop, not a meeting room

Costworks was built alongside a working structural steel fabricator, around the way their week actually runs — the paper sheet, the job register, the Sunday rate and the nights away. This is what that looks like.

Coast 2 Coast Engineering
Trade
Structural steel fabrication
Where
Cooksland Industrial Estate, Bodmin
Since
2018
Works in
Mild steel, stainless, aluminium

coast2coastengineering.co.uk

Coast 2 Coast Engineering

Structural steel fabricators in Bodmin, Cornwall

Welded steelwork for construction, access steelwork for water and power infrastructure, and one-off architectural metalwork — fabricated in their own workshop and installed on site.

Their week is a fabricator’s week: crews split between the workshop and site, several jobs in a day, nights away on installs, subcontractors who invoice for their time, and weld records that have to stand up to an EN 1090 audit. The accreditations shown on their own site include EN 1090, Achilles, CHAS and UKCA.

EN 1090AchillesCHASUKCA

How they use it

Their week, the way it already ran

Nothing on the shop floor had to change to fit the software. Each of these is something their office asked for, or something their paper system already did that Costworks had to do as well.

Since 28 Sep 2026

Weeks that run Saturday to Friday

Their payroll week starts on a Saturday, so their weeks in Costworks do too. Moving the week start moved every shift already recorded into its new week in one go, so nothing was left belonging to a week nobody could send.

Their register, carried on

Their own job numbers

Their paper job register came across, so the numbers on the job sheets still mean the same jobs. The office types the number off the sheet — 26 275 is read as 2026-0275 — and the next new job carries on from the highest.

Admin and yard

Hours that belong to no job

Time in the office or tidying the yard goes against a word job of its own, like 2026-ADMIN or 2026-YARD, so it is counted without pretending to be a job.

Asked for, and built · 15 Oct 2026

Stay-away nights in gross pay

Installs away from home earn a set amount a night. The crew tick “Stayed away overnight” on the day, the office can tick it for them, and the nights are counted straight into gross pay on the Timesheets board and the monthly report.

Off the invoice

Subcontractors on the job, not the payroll

Subcontractors invoice for their time. The office enters their days from each invoice, against the job, and those hours count on the job and its audit report — and never anywhere near the payroll.

EN 1090

Weld records, signed off in the office

Wire, gas and plant go on the shift as it is recorded. The office marks each record checked, and nobody can sign off their own.

For the job pack

An audit report for every job

Who worked on it and when, the weld records and who checked them, and the materials used — with no pay in it, headed with the company’s own details. A whole week’s reports download as one zip.

Asked for, and built · 8 Oct 2026

Materials the office can correct

The crew record what went on the job from the office’s own catalogue. When a quantity went in twice, the office asked to be able to take it back off — so now it can, with a line in the record saying who did.

Shifts as they really are

Two jobs a day, and nights over midnight

Workshop in the morning and site in the afternoon is two shifts, each against its own job. A shift that finishes after midnight is one shift, and its hours come out right.

Working together

An office that asks, and software that answers

When something on their week does not fit, they say so. The people who built Costworks change it, test it, and put it live — and every other firm gets the same improvement.

Step one

The office asks

A rule, a column, a screen that does not quite fit.

Step two

We work it through

What it means for pay, for the crew and for the records.

Step three

It is tested

Against worked examples, before it goes anywhere near a payroll.

Step four

It goes live

For them, in the app they already use. Nothing to install.

Step five

Everybody has it

Every firm on Costworks gets the same improvement.

Could your firm be next?

Made for firms that pay by the hour, against jobs

If your people work hours against numbered jobs, split between the workshop and site, and your payroll needs those hours banded and priced, Costworks was built for a week like yours.

Structural steel

Frames, mezzanines, stairs and platforms — fabricated in the workshop, installed on site, often far from home.

Fabrication and welding

Jobbing shops where several jobs share a day, and weld records have to follow the work.

Sheet metal

Hours and materials against each order, with the units that the shop already uses.

Architectural metalwork

One-off pieces where knowing the hours a job really took is the difference on the next quote.

M&E and site contractors

Crews on several sites, night work, Sunday rates and bank holidays, all paid by the hour.

Something else?

If your week works differently, that is the interesting part of the conversation. Tell us how it runs.

Tell us how your week works

We will ask what your current sheet looks like and what payroll does with it, and give you a straight answer on whether Costworks fits — including if it does not.